
19
8.2
Valve Block Mounting
1.
Mount the valve block on the center section of the boom near the sprayer valve block, as
illustrated in
Figure 22
.
2.
Insert the threaded rod into the block and use a hex nut to hold the rod. The block holes
are 3/8” NC-1” deep. If bolts are used instead of the threaded rod, ensure the bolts thread
in at least 3/8”.
3.
Use the remaining hardware to secure the block to the sprayer.
4.
Cut off excess threaded rod, if necessary.
Figure 22: Valve Block Mounting
Ensure that the temperature probe from the Valve Module is attached to the
NORAC valve block as shown in the green square in Figure 22. This is NOT a
ground connection.
Содержание UC5 Rogator 600
Страница 1: ...Spray Height Controller Rogator 600 Installation Manual RG09 ...
Страница 6: ...3 3 Kit Parts 3 1 Kit Overview Figure 2 RG09 System Parts ...
Страница 7: ...4 3 2 Hydraulic Plumbing Figure 3 RG09 Hydraulic Plumbing ...
Страница 11: ...8 Figure 7 Wing Sensor Bracket Mounting on Chafer Boom Outer Inner ...
Страница 19: ...16 Figure 19 Input Module Mounting ...
Страница 27: ...24 10 3 ITEM C03 43210 03 CABLE UC5 NETWORK 18 AWG 3M 10 4 ITEM C04 43210 01 CABLE UC5 NETWORK 18 AWG 1M ...
Страница 28: ...25 10 5 ITEM C05 43210 10 CABLE UC5 NETWORK 18 AWG 10M 10 6 ITEM C10 43230 04 CABLE UC5 VALVE DT TO DT ...
Страница 29: ...26 10 7 ITEM C20 43240 01 CABLE UC5 INTERFACE TILT DT ...
Страница 30: ...27 10 8 ITEM C21 43240 31 CABLE UC5 INTERFACE MAIN DT WITH AUX 1 2 3 ...