
13
6.2
Valve Module
1.
Install the valve module (E02) to the top of the NORAC valve block. Orient the 6-pin
Deutsch (CANbus) connectors towards the P and T ports with the label facing up.
Figure 14: Valve Module
2.
Verify the valve coil connectors are oriented vertically (
Figure 15
).
Figure 15: Align Coils
3.
Place the valve module between the valve coils. Slide a valve mounting bracket over the
connectors of the valve module and the valve coil connectors. This may require flexing the
plastic bracket slightly (
Figure 16
).
4.
Ensure the bracket is pushed over the connectors far enough to allow the clips to engage
behind the valve connectors.
Output Number Normal Function
1
Left Up
2
Left Down
3
Right Up
4
Right Down
5
Option 1
6
Option 2
7
Option 3
8
Option 4
Содержание UC5 Rogator 600
Страница 1: ...Spray Height Controller Rogator 600 Installation Manual RG09 ...
Страница 6: ...3 3 Kit Parts 3 1 Kit Overview Figure 2 RG09 System Parts ...
Страница 7: ...4 3 2 Hydraulic Plumbing Figure 3 RG09 Hydraulic Plumbing ...
Страница 11: ...8 Figure 7 Wing Sensor Bracket Mounting on Chafer Boom Outer Inner ...
Страница 19: ...16 Figure 19 Input Module Mounting ...
Страница 27: ...24 10 3 ITEM C03 43210 03 CABLE UC5 NETWORK 18 AWG 3M 10 4 ITEM C04 43210 01 CABLE UC5 NETWORK 18 AWG 1M ...
Страница 28: ...25 10 5 ITEM C05 43210 10 CABLE UC5 NETWORK 18 AWG 10M 10 6 ITEM C10 43230 04 CABLE UC5 VALVE DT TO DT ...
Страница 29: ...26 10 7 ITEM C20 43240 01 CABLE UC5 INTERFACE TILT DT ...
Страница 30: ...27 10 8 ITEM C21 43240 31 CABLE UC5 INTERFACE MAIN DT WITH AUX 1 2 3 ...