
15
6.3
Input Module
1.
Install the input module (E03) on the sprayer near the NORAC valve block. Secure it to
the boom with cable ties.
2.
Connect the free end of the CANbus cable (C02) from the valve module to the input
module.
3.
Insert the 12 pin plug (P02) into the
OEM 3
connector on the end of the input module.
4.
Connect the 12 pin connector on the tilt interface cable (C20) to the
Thru 2
connector on
the side of the input module.
5.
Connect the 12 pin connector on the main lift interface cable (C21) to the
Thru 1
connector on the side of the input module.
6.
Insert the connectors on C21 into the connectors on the Relay Module (AGCO Part
Number: 121749).
7.
Insert the connectors on C20 into the VG solenoid connectors on the Rogator wiring
harness.
Figure 18: Input Module Connections
Содержание UC5 Rogator 600
Страница 1: ...Spray Height Controller Rogator 600 Installation Manual RG09 ...
Страница 6: ...3 3 Kit Parts 3 1 Kit Overview Figure 2 RG09 System Parts ...
Страница 7: ...4 3 2 Hydraulic Plumbing Figure 3 RG09 Hydraulic Plumbing ...
Страница 11: ...8 Figure 7 Wing Sensor Bracket Mounting on Chafer Boom Outer Inner ...
Страница 19: ...16 Figure 19 Input Module Mounting ...
Страница 27: ...24 10 3 ITEM C03 43210 03 CABLE UC5 NETWORK 18 AWG 3M 10 4 ITEM C04 43210 01 CABLE UC5 NETWORK 18 AWG 1M ...
Страница 28: ...25 10 5 ITEM C05 43210 10 CABLE UC5 NETWORK 18 AWG 10M 10 6 ITEM C10 43230 04 CABLE UC5 VALVE DT TO DT ...
Страница 29: ...26 10 7 ITEM C20 43240 01 CABLE UC5 INTERFACE TILT DT ...
Страница 30: ...27 10 8 ITEM C21 43240 31 CABLE UC5 INTERFACE MAIN DT WITH AUX 1 2 3 ...