15
6.3
Hydraulic Plumbing
From this point on in the installation the booms will be inoperative until the
hydraulics are fully installed.
1.
After the NORAC valve is mounted, the hydraulic hoses and fittings can be plumbed. The
plumbing for the hydraulic circuit is shown schematically in
Figure 3.
2.
Connect hoses H02 to the “A” and “B” ports of the NORAC expansion block and route to
the roll cylinder.
3.
Connect the hose from the “A” port to the port on the rod end of the cylinder using a
6MOR-6FORX90 (F12) fitting and a 6MB-6MOR (F13) fitting.
4.
Connect the hose from the “B” port to the port on the barrel of the cylinder using a
6MOR-6FORX90 (F12) fitting and a 6MB-6MOR (F13) fitting.