OPERATION
10
Nobles Strive Rider (09--06)
MACHINE SETUP
PREPARING MACHINE FOR READYSPACE
CLEANING
1. Park the machine on a level surface and remove
the key. Make sure the scrub head is in the raised
position.
2. Remove the idler plates from the scrub head
(Figure 6).
Idler plate
FIG. 6
3. Install the ReadySpace rollers and re-fasten the
idler plates (Figure 7).
ReadySpace
Rollers
FIG. 7
4. Connect the green ReadySpace vacuum hose to
the recovery intake connector (Figure 8).
Green Hose --
ReadySpace
Cleaning
FIG. 8
PREPARING MACHINE FOR RESTORATIVE
EXTRACTION CLEANING
FIRST TIME USE:
See PRIMING SOLUTION
SYSTEM on page 24.
1. Park the machine on a level surface and remove
the key. Make sure the scrub head is in the raised
position.
2. Remove the idler plates from scrub head
(Figure 9).
Idler plate
FIG. 9
3
Install the extraction brushes and re-fasten the idler
plates (Figure 10).
NOTE: The brush end with the
letter “ I ” indicates idler plate end. The “I” should
face outward.
“ I ”
Idler
plate
end
Extraction
Brushes
FIG. 10
4. Connect the blue extraction vacuum hose to the
recovery intake connector (Figure 11).
Blue Hose --
Extraction
Cleaning
FIG. 11
Содержание STRIVE RIDER
Страница 29: ...OPERATION Nobles Strive Rider 09 06 29 MACHINE DIMENSIONS 32 in 813 mm 61 5 in 1 560 mm 52 in 1 325 mm ...
Страница 34: ...TABLE OF CONTENTS Nobles StriveR Rider 09 2006 4 ...
Страница 44: ...STANDARD PARTS Nobles StriveR Rider 09 2006 14 INSTRUMENT PANEL GROUP 2 1 3 4 5 6 7 8 9 4 12 13 14 13 12 10 11 ...
Страница 46: ...STANDARD PARTS Nobles StriveR Rider 09 2006 16 FRONT DRIVE WHEEL GROUP 11 3 2 6 8 10 1 7 5 4 9 8 9 12 13 14 15 ...
Страница 60: ...STANDARD PARTS Nobles StriveR Rider 09 2006 30 TANKS DRAIN GROUP 2 10 11 1 12 5 11 12 3 4 6 8 9 7 ...
Страница 80: ...STANDARD PARTS Nobles StriveR Rider 03 2013 50 BATTERY GROUP 360Ah 2 8 6 7 1 9 11 12 13 5 5 10 14 3 4 3 4 15 ...
Страница 83: ...STANDARD PARTS Nobles StriveR Rider 03 2009 53 ...
Страница 109: ...BREAKDOWNS Nobles StriveR Rider 03 2013 79 ...