Install all Pulleys (AO & AP) with the shown spacers & bolting.
20. Start installation of the
Press Arm Cable
(AX) by looping it, at its middle, over a
Pulley
& bolting it to
previously installed pulley brackets on the end of
Stack Cable
. Installation of
Press Arm Cable
is
detailed for one side & is typical for both sides. Loosely bolt 2
Pulleys
, 2 Pulley Cable Retainers (19)
& a
Pulley Spacer 2"
(21) to
Lower Plates R&L
. Loop
Press Arm Cable
under the
Pulley Cable
Retainer
and over pulley. Loop
Press Arm Cable
over a
Pulley
, along with a Pulley Cable Retainer,
attach to
Press Arm
. Loop
Press Arm Cable
over a
4-1/4" Pulley
(AP) install it in
Press Arm Pulley
Bracket R&L
along with a
Pulley Spacer 2"
(21). On the opposite side, repeat the above instructions.
21. Start installation of
Leg Extension Cables
(AW) at
Leg Extension
and continue in order until the last
connection at two previously installed Pulley Brackets on
Lat Cable
. Install
Cable Retainer
(32), a
3/8" thk Spacer
(AA) & a
1/2" thk Spacer
(AB) with the fourth
Pulley
.
22. Complete installation of
Pulley Guard Cables
(AZ) by removing a 1/2" Jam Nut from each hollow bolt
on cable end, inserting bolts through hole in lugs on
Lower Plates R&L
& reinstalling 1/2" Jam Nut.
Remove cables slackness by adjusting the 1/2" Jam Nuts & tightening them against the lugs.
23. Install 2 -
2" Plastic Caps
(AF) where shown.
24. Complete installation of
Cables by threading the end of
the
Stack Cable
(AU) into the
Selector Rod
(23) until
slackness in the cables is
removed. Tighten the jam nut
against the Selector Rod.
Periodic cable tightening may be
required.
-7-
D
E
D
G
21
AC
AW
AC
AF
2 Places
H
Typical
Unless Noted
AB
5 Places
J
Where Shown
6 Places
D
A
G
AA
2 Places
19
4 Places
H
2 Places
I
21
4 Places
C
4 Places
A
AU
Jam Nut
24
Jam Nut
AZ
AO
AX
11 Places
C
AP
2 Places
32
AA