© 2017 Adolf Nissen Elektrobau GmbH + Co. KG
ENGLISH
Star-Flash LED 620B/ 627B FÜQ
24
2.3.4
Installation
Star-Flash LED 627B FÜQ
Install the lamps close behind one another
or leave them in the transport cradle.
Switch on the first lamp by using the side
switch (the other lamps switch on in se-
quence).
After a short time the lamps are synchroni-
sed.
The synchronisation remains intact for ap-
prox. 1 minute, also after a short dis-
connection of one lamp.
At an irregularity in synchronisation the
switching on/off the lamps must be repea-
ted.
Star-Flash LED 620B FÜQ
This lamp type is switched on/off with the
side switch.
1
2
Take the lamps out of the transport cradle.
Fold out the stand supports like shown in
step 1 and 2 for a higher stability.
The stand supports are colored in pairs.
Fold out the black stand supports firstly fol-
lowed by the white ones.
Fold in the stand supports in reverse order.
Содержание Star-Flash LED 620A
Страница 2: ......