1
.
Inspection
20
No.704-2010-01
2.6.
Replacement procedure of SSR
When the temperature is not controlled, check the following points. If they are all OK, SSR is
defective
1. The temperature indication is correct. (Defective thermocouple, board or cable if NG.)
2. Not interlocked. (Disconnection of thermocouple or wrong temperature setting if NG)
3. The control signal changes 0 or 24V when temperature setting is changed. (Defective
board or cable)
(1) Preparation of tools/parts
(2) Parts dismounting
Turn the main power OFF. Do not start working when the temperature of each heater
is high. (Start working after 2 hours from turning the power OFF when the temperature
is high.)
Pull up the ring latch and remove the top cover panel.
No.
Name
Part No.
Qty
Remarks
①
MA-3000
1
Main body
②
Philips screw drive (02)
1
Tool
③
Long-nose plier
1
Tool
④
Ball-point screw driver
1
Accessory