background image

 

NIFTY 

LIFT 

 

   

OPERATING INSTRUCTIONS 

 
Note: Clear illustrations of the controls of this machine are shown on the pages following this section of 
the manual. 
 

Radio Remote Basket 

 

Radio Remote Startup 

 
To activate the radio remote control system: 
 

  Switch the key switch next to the START button on the transmitter to the ‘O’ position. Ensure that the 

battery is in its housing and has enough charge. Check that the STOP button has not been pressed 
and that none of the joysticks are activated (out of neutral). Turn the Key switch to the ‘I’ position and 
press and hold the START button, releasing on when the green LED starts to flash.  

 

NOTE: Check that the green LED on the turret electrical junction box stating ‘REMOTE 
            CONTROL ACTIVE’ is ON.  
 
NOTE: The radio remote transmitter will only switch on if there is enough charge in the battery 
             if all joysticks are inactive. 

 
The remote control system is now ready to operate. Check that all machine functions correspond to the 
transmitter functions. 
 

Boom Controls 

 

  To enable boom controls, the deadman joystick, located at the centre of the transmitter, must be 

moved and held either to the left or to the right as indicated. 

 

  Once the deadman has been activated, the EWP functions; bottom boom lift, top boom lift, tele boom 

extension and slew (not necessarily in that order), may be operated by pushing down on the 
respective joystick and moving it to the desired function. 

 

NOTE: EWP FUNCTIONS WILL NOT OPERATE UNLESS THE DEADMAN JOYSTICK IS OPERATED 
PRIOR TO A FUNCTION JOYSTICK BEING OPERATED. 
 

  For precise operation of EWP functions, move the FAST/SLOW switch to the SLOW position to 

reduce the work platform function speeds.   

 

Hydraulic Power Tools (If fitted) 

 

  To operate the hydraulic power tools open the ball valve (ON) located on the base control cover prior 

to entering the basket. 

 

  With the DC PUMP/POWER TOOLS switch on the transmitter in the neutral position, connect the 

power tools hoses to the quick release couplings located outside the basket. 

 

  Once the tools are connected, move the DC PUMP/POWER TOOLS switch on the transmitter to the 

POWER TOOLS position to allow the flow of hydraulic oil to the power tool. 

 

  Adjust the speed of the tools using the needle valve, which is located near the quick release 

couplings outside the basket. 

 

 
 
 
 

24.03.19 

Содержание NL140RKT

Страница 1: ......

Страница 2: ......

Страница 3: ...IN THE BASKET TO INCREASE HEIGHT DO NOT ANCHOR THE BASKET TO ANY STRUCTURE DO NOT RAISE THE BASKET IF THE MACHINE IS NOT LEVELLED WITHIN THE 5o LIMIT DISPLAYED ON THE LEVEL BUBBLE DO NOT STAND ON THE...

Страница 4: ...S OR REAR ONLY STABILISERS MUST NOT BE USED ON SIDE SLOPE IF THE MACHINE IS TO BE OPERATED ON A SIDE SLOPE IT MUST BE POSITIONED SO THAT THE VEHICLE IS FACING UP THE SLOPE I E THE CAB OF THE VEHICLE I...

Страница 5: ...k located at the centre of the transmitter must be moved and held either to the left or to the right as indicated Once the deadman has been activated the EWP functions bottom boom lift top boom lift t...

Страница 6: ...d of time the engine may be stopped by pressing the ENGINE START STOP button When required the engine may be started again by pressing the ENGINE START STOP button again Emergency DC Pump GROUND trans...

Страница 7: ...ng The accumulator located on the vehicle is kept charged i e pressurised while the vehicle engine is running during normal operation of the work platform When charged it holds a volume of hydraulic o...

Страница 8: ...CKOUTS WILL NOT OPERATE UNLESS THE TOP BOOM OF THE WORK PLATFORM IS STOWED WARNING DEFLATE AIRBAG SUSPENSION IF FITTED BEFORE ENGAGING SPRING LOCKOUTS To operate the spring lockouts depress the deadma...

Страница 9: ......

Страница 10: ......

Страница 11: ......

Страница 12: ......

Страница 13: ......

Страница 14: ......

Страница 15: ...NIFTY LIFT SYSTEM COMPONENTS CIRCUIT DIAGRAMS 24 00 18...

Страница 16: ......

Страница 17: ......

Страница 18: ......

Страница 19: ......

Страница 20: ...I19 I10 I9 I11 I12 Q6 Q5 I13 I14 I15 I16 I17 I18 Q8 Q7 Q9 Q10 Q11 Q12 Q13 Q15 I20 Q14 Q16...

Страница 21: ......

Страница 22: ......

Страница 23: ......

Страница 24: ......

Страница 25: ...DC PUMP POWER TOOLS ENGINE START STOP UPPER BOOM LOWER UPPER BOOM RAISE LOWER BOOM LOWER BOOM EXTEND BOOM RETRACT SLEW CW LOWER BOOM RAISE SLEW CCW NIFTY LIFT N12335 DEADMAN F3 Z3H G2 Z2L F2 Z2H G3 Z...

Страница 26: ...ar with mechanical procedures Before operating the machine the operator must be sure that the machine has been properly maintained The operator should carry out the daily inspections described in this...

Страница 27: ...eck guardrails sideboards and floors for damage Inspect critical welds at base and frame for signs of cracks damage or distortion Check pins and bushes for wear Check condition of insulation covers bo...

Страница 28: ...f damaged or missing Check all Emergency systems emergency batteries and charging system operation of electric pump and emergency controls Check for correct operation of spring lockouts and or stabils...

Страница 29: ...mage or hose wire damage Check speed of all operations see separate spec sheet Check directional arrows function correctly if fitted Check revolving lamps if fitted Electrical test unit Fill out opera...

Страница 30: ......

Страница 31: ......

Страница 32: ......

Страница 33: ......

Страница 34: ......

Страница 35: ......

Страница 36: ...nd Serien nummer G PVM Woche und Jahr der Herstellung C PVG num ro semaine et ann e de montage et num ro s riel D PVP r glage de pression E PVP num ro semaine et ann e de fabrication et num ro s riel...

Страница 37: ...Nm Weicheisen Dichtring 1150 lbf in 1850 lbf in 1150 lbf in 1850 lbf in 350 lbf in 150 lbf in 350 lbf in avec rondelle en acier med kobberskiv with copper washer 30 Nm 50 Nm 30 Nm 50 Nm 20 Nm 15 Nm 20...

Страница 38: ...le de 22 5 C H ndtaget skal skrues helt i bund C Screw the lever completely home C Den Hebel v llig einschrauben C Visser le manipulateur entierement au fond Fod med en vinkel p 37 5 Base with an angl...

Страница 39: ...15 V 22 30 V Pin 1 2 1 2 Q P A UDC 0 UDC 0 Q P B 0 UDC 0 UDC Neutral 0 0 0 0 UDC 11 15 V 22 30 V Pin 1 U 2 US 1 U 2 US Q P A UDC 0 5 0 25 x UDC UDC 0 5 0 25 x UDC Q P B UDC 0 5 0 75 x UDC UDC 0 5 0 75...

Страница 40: ...V 22 30 V Pin 1 2 1 2 Q P A 0 UDC 0 UDC Q P B UDC 0 UDC 0 Neutral 0 0 0 0 UDC 11 15 V 22 30 V Pin 1 U 2 US 1 U 2 US Q P A UDC 0 5 0 75 x UDC UDC 0 5 0 75 x UDC Q P B UDC 0 5 0 25 x UDC UDC 0 5 0 25 x...

Страница 41: ...id valve B Magnetventil B Electrodistributeur Gr n Green Gr n Vert A Eksternt rel A External relay A Externes Relais A Relais externe B Magnetventil B Solenoid valve B Magnetventil B Electrodistribute...

Страница 42: ...tagsvandring i neutralstilling 1 S t hydraulisk tryk p systemet 2 Tilslut forsyningssp nding UDC Signalsp nding 0 5 x UDC eller afbryd signalsp nding US Check max lever travel in neutral position 1 Ma...

Страница 43: ...aulic build up of PVEK it may be necessary to bleed the PVEK A non bleed PVEK may among others give rise to abnormal vibrations in the PVEM lever Udluftning wenn die Gruppe vertikal montiert ist empfe...

Отзывы: