32
Unidrive M Modular Installation Guide
Issue Number: 2
Figure 5-11 Installation of parallel cable management bracket
Loosen the ground connection nuts and slide the cable management
bracket in the direction shown. Once in place, the ground connection
nuts should be tightened with a maximum torque of 2 N m (1.47 Ib ft).
Содержание 09201760D
Страница 92: ...0478 0141 02...