![Nibe Contura 655 Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/nibe/contura-655/contura-655_installation-instructions-manual_1686484008.webp)
54
GB
The insert is prepared for top connection at
delivery. When connecting from the rear, the
cover and connection must be swapped around.
LEK
Connection to the chimney
Refer to the chimney’s installation instructions to install the chimney. The following describes how the chimney
is connected to the stove.
Top connection
Install the start pipe on the connection. Make sure
that the gasket on the connection does not work
loose from its position. If further sealing material is
required, heat-resistant sealant may be used.
LEK
Install the connection pipe on the connection. Make
sure that the gasket does not work loose from its
position. Caulk between the connection pipe and the
connector in the wall using caulking rope. If further
sealing material is required, heat-resistant sealant
may be used.
Rearwards to a masonry chimney
Mark out centre for making a hole in the wall to the flue. Check that the connection height in the chimney
breast corresponds to the height of the connection pipe from the stove.
Cut a hole approximately 180 mm in diameter and then cement in a wall connector with fireproof mortar (not
supplied). Let the mortar dry before the stove is connected to the chimney.
Important!
At the top connection, it is important that the hot air
grille is installed before the chimney.
LEK
Содержание Contura 655
Страница 18: ......
Страница 19: ......
Страница 20: ...NIBE AB NIBE Brasv rme Box 134 SE 285 23 Markaryd Sweden www contura eu...