11
We reserve the right to make technical changes
83053706dUK – Translation of the operating manual
NIBE
TM
AP-BW30
The following steps are to be carried out on all 4
hydraulic connections of the heat pump:
Push the insulation elements included in the scope
of delivery onto the plate heat exchanger
Position the back panel of the heat pump on the
basic heat pump module
Connect the piece of pipe supplied to the threaded
flange and insulate it with the enclosed insulating
hose
Connect the connectors to the connection clip
included in the scope of supply to the corresponding
connection on the heat pump.
Use the insulating tape supplied to insulate the
connection clip. Use the enclosed fastening
materials to additionally fix the insulation.
NOTE:
We recommend completing step
after the
leak test.
NOTE:
The heat source and heating side must be
insulated from the heat pump; to this end we
recommend using the IPFK hydraulic connection
set in our range of products (not included in the
scope of delivery).
Install shut-off devices at the heating circuit.
Install shut-off devices at the heat source.
Place a bleeder at the highest point of the heat
source in the heat source outlet…
We recommend installing a dirt filter (screen size
0.9 mm) on the heat source inlet connection…
The hot water and heat source connections are
marked accordingly on the unit.
For the positioning of the connections, please
refer to the dimensioned drawing for the
respective model.