Step 29: Fireman’s Pole Assembly
•
Place the fir
eman’s pole into its position and mark the position that it will go into the
ground, which will be the centre of the railing and out the same distance as the turn in the
pole itself
•
Dig a hole about 10” deep and 10” in diameter
•
Place the fireman’s pole int
o the hole and cut off any excess length so that the pole can be
secured into the top rail
•
Secure the climbing pole onto the top rail using 65mm decking screws supplied
•
Concrete the pole into its place ensuring that it remains parallel to the tower posts
Содержание Mount Juliet
Страница 1: ...Mount Juliet 6ft Double Climbing Frame Instruction Manual...
Страница 5: ...13 200mm index screws 26 14 120mm screws 40 15 Set of steps 1 16 Screw covers 40...
Страница 19: ...Step 11 Repeat steps 9 and 10 for each railing...
Страница 25: ......
Страница 27: ......
Страница 29: ......
Страница 36: ......
Страница 38: ......
Страница 42: ......
Страница 44: ...Step 32 Cut the 3 x 1 5 flush with the A frame posts...
Страница 50: ...Step 38 Swing Attachment Hang your chosen swings from the swing hooks...