Step 19: Monkey Bar Module Assembly
•
Lay out the 2 posts on a flat surface
•
Attach the 420mm post to the top of the posts as shown, using the 200mm screws. Please
ensure that the 420mm post is flush with the cut on the top of each 3m post
Step 20:
•
Attach a piece of 1755mm x
3” x 1.5” across the middle of the A
-frame to hold it in its place
when lifted. To position this, mark 900mm down from the top of each post and line up the
top of the 1755mm timber to each of these lines
Содержание Mount Juliet
Страница 1: ...Mount Juliet 6ft Double Climbing Frame Instruction Manual...
Страница 5: ...13 200mm index screws 26 14 120mm screws 40 15 Set of steps 1 16 Screw covers 40...
Страница 19: ...Step 11 Repeat steps 9 and 10 for each railing...
Страница 25: ......
Страница 27: ......
Страница 29: ......
Страница 36: ......
Страница 38: ......
Страница 42: ......
Страница 44: ...Step 32 Cut the 3 x 1 5 flush with the A frame posts...
Страница 50: ...Step 38 Swing Attachment Hang your chosen swings from the swing hooks...