Step 26: Rock Wall Assembly
•
The rock wall is typically made slightly longer than required to allow for a slope
•
Place the rock wall against the top of a closed railing
•
Measure the amount you may have to take off the bottom of the rock wall
•
Cut the bottom of the rock wall to ensure that it fits flush onto the top of the top rail
•
Screw the rock wall into its place using 2 x 65mm screw per board, ensuring you predrill the
holes to avoid splitting the timber
Содержание Mount Juliet
Страница 1: ...Mount Juliet 6ft Double Climbing Frame Instruction Manual...
Страница 5: ...13 200mm index screws 26 14 120mm screws 40 15 Set of steps 1 16 Screw covers 40...
Страница 19: ...Step 11 Repeat steps 9 and 10 for each railing...
Страница 25: ......
Страница 27: ......
Страница 29: ......
Страница 36: ......
Страница 38: ......
Страница 42: ......
Страница 44: ...Step 32 Cut the 3 x 1 5 flush with the A frame posts...
Страница 50: ...Step 38 Swing Attachment Hang your chosen swings from the swing hooks...