Step 18: Rope Bridge Assembly Step 4
•
Attach the rope and safety netting, you will need to thread the beige rope in and out of the
green netting at one side the whole way through. Copy this for both lengths of rope and
netting
•
First use the big u-nails to attach the 3m beige rope to the top of the railing, ensuring you have
the same overhang both sides and the rope is pulled good and tight to minimise sagging
•
Once both sides are secure, you can now fit the netting using the small u-nails (27). You will
need to nail both sides first, starting at the top, before you nail across the rope bridge. After
you have the first side nailed you may need to cut a column of squares of the length of the
netting if it is too loose. Be careful not to cut too many as the netting will get tighter as you
move down it. Ensure you nail along the same line as far across the bridge as you can to keep
the rope level
Содержание Mount Juliet
Страница 1: ...Mount Juliet 6ft Double Climbing Frame Instruction Manual...
Страница 5: ...13 200mm index screws 26 14 120mm screws 40 15 Set of steps 1 16 Screw covers 40...
Страница 19: ...Step 11 Repeat steps 9 and 10 for each railing...
Страница 25: ......
Страница 27: ......
Страница 29: ......
Страница 36: ......
Страница 38: ......
Страница 42: ......
Страница 44: ...Step 32 Cut the 3 x 1 5 flush with the A frame posts...
Страница 50: ...Step 38 Swing Attachment Hang your chosen swings from the swing hooks...