Step 9: Railings Assembly
•
There are 4 railings per tower. The open ones are typically for the rope bridge, steps,
fireman’s pole, monkey bars and slide; the closed ones are for the rock wall, cargo net and
swing module.
Ensure to fit the railings in their correct positions depending on the desired
layout of the frame.
They should fit tightly into place between the upright posts and on the
base
•
The ‘double’ timbers on the railings should be on top and the single timber
should be at the
bottom
•
Secure the bottom rail to the base using the decking screws
Содержание Mount Juliet
Страница 1: ...Mount Juliet 6ft Double Climbing Frame Instruction Manual...
Страница 5: ...13 200mm index screws 26 14 120mm screws 40 15 Set of steps 1 16 Screw covers 40...
Страница 19: ...Step 11 Repeat steps 9 and 10 for each railing...
Страница 25: ......
Страница 27: ......
Страница 29: ......
Страница 36: ......
Страница 38: ......
Страница 42: ......
Страница 44: ...Step 32 Cut the 3 x 1 5 flush with the A frame posts...
Страница 50: ...Step 38 Swing Attachment Hang your chosen swings from the swing hooks...