Tools needed:
•
Cordless drill
•
Handsaw
•
Spirit Level
•
Hammer
•
Shovel
•
Stepladder
•
Pencil
•
Measuring tape
•
10mm Hex bit
•
PZ 2 Drill Bit
Ground Preparation
1.
Lay out the bases slide and 12ft swing bar in the position that you intend the climbing frame
to be placed. Ensure the bases are 2160mm apart and are parallel of any buildings, fences
etc. that you are wishing to match in with. This will give you the size of the footprint the
frame will take up in the garden.
2.
Allow for at least 2m clearance beyond the end of the slide and 1.5m clearance for the other
modules.
3.
Once you are happy that the layout is correct, remove the swing bar and slide.
4.
Mark out clearly the centre of all 4 cut outs of each base. Once these are marked you can lift
the bases out of your way and then dig your holes.
5.
If the climbing frame is on a level surface, then dig the
holes at a diameter of 12” and depth
12”. The tricky part is when the surface is uneven; in this case you would have to
compensate for the slope by making some holes deeper or shallower than others (minimum
depth of 10”). The bottoms of all
holes need to be level.
Содержание Highlands Commercial
Страница 1: ...The Highlands Commercial 6ft Triple Climbing Frame Instruction Manual...
Страница 14: ...Step 7 Using 2 pieces of 1575mm x 3 x 1 5 timber connect the two H frames together using decking screws...
Страница 18: ...Step 11 Repeat steps 9 and 10 for each railing...
Страница 25: ......
Страница 27: ......
Страница 28: ......
Страница 29: ...Step 19 Repeat previous steps to assemble the 2nd bridge...
Страница 34: ......
Страница 36: ......
Страница 38: ......
Страница 43: ...Step 33 Remove H Frame Supports Remove the H Frame supports that were added during steps 3 7...