![NI Climbing Frames Highlands Commercial Скачать руководство пользователя страница 30](http://html1.mh-extra.com/html/ni-climbing-frames/highlands-commercial/highlands-commercial_instruction-manual_1685725030.webp)
Step 20: Swing Module Assembly
•
Lay the 2 x 9ft posts (with the ends cut off at 60 degrees) on a flat surface.
•
Place the ends together so that it forms an A-shape.
•
Using the 200mm index screws, screw the ends together, so the two posts meet nice and
flush on all sides.
Step 21:
•
Measure down from the top of the ‘A’ post 900mm to both posts and place the 1755mm 3”
x 1.5”
timber across both posts and secure these into place with decking screws.
Содержание Highlands Commercial
Страница 1: ...The Highlands Commercial 6ft Triple Climbing Frame Instruction Manual...
Страница 14: ...Step 7 Using 2 pieces of 1575mm x 3 x 1 5 timber connect the two H frames together using decking screws...
Страница 18: ...Step 11 Repeat steps 9 and 10 for each railing...
Страница 25: ......
Страница 27: ......
Страница 28: ......
Страница 29: ...Step 19 Repeat previous steps to assemble the 2nd bridge...
Страница 34: ......
Страница 36: ......
Страница 38: ......
Страница 43: ...Step 33 Remove H Frame Supports Remove the H Frame supports that were added during steps 3 7...