![NI Climbing Frames Highlands Commercial Скачать руководство пользователя страница 42](http://html1.mh-extra.com/html/ni-climbing-frames/highlands-commercial/highlands-commercial_instruction-manual_1685725042.webp)
Step 31: Swing Attachment
•
Hang your chosen swings from the swing hooks.
Step 32: Concreting structure
•
Using postcrete
and following the manufacturer’s instructions, concrete all the posts into
the ground.
•
The frame should be left overnight before it is used to ensure the postcrete has dried.
•
Once dry you can clean of any excess concrete on the post. We would normally leave the
concrete down a few inches so it can be covered over with the sod of grass you cut out the
hole at the start. Ensure the concrete is completely dry before you do this.
Содержание Highlands Commercial
Страница 1: ...The Highlands Commercial 6ft Triple Climbing Frame Instruction Manual...
Страница 14: ...Step 7 Using 2 pieces of 1575mm x 3 x 1 5 timber connect the two H frames together using decking screws...
Страница 18: ...Step 11 Repeat steps 9 and 10 for each railing...
Страница 25: ......
Страница 27: ......
Страница 28: ......
Страница 29: ...Step 19 Repeat previous steps to assemble the 2nd bridge...
Страница 34: ......
Страница 36: ......
Страница 38: ......
Страница 43: ...Step 33 Remove H Frame Supports Remove the H Frame supports that were added during steps 3 7...