Step 22
: Fireman’s Pole Assembly
•
Place the fireman’s pole into its position and mark the position that it
will go into the
ground, which will be the centre of the railing and out the same distance as the turn in the
pole itself
•
Dig a hole about 10” deep and 10” in diameter
•
Place the fireman’s pole into the hole and cut off any excess length so that the pole ca
n be
secured into the top rail
•
Secure the climbing pole onto the top rail using 6x60 screws supplied
•
Concrete the pole into its place ensuring that it remains parallel to the tower posts
Содержание Hangout Climbing Frame
Страница 1: ...Hangout Climbing Frame Instruction Manual ...
Страница 5: ...12 Decking screws Approx 300 13 200mm index screws 30 14 120mm screws Approx 40 15 3620mm x 4 x 2 2 ...
Страница 6: ...16 3 6m x 3 x 1 5 2 17 1575mm x 3 x 1 5 5 18 Set of steps 1 19 Screw covers Approx 20 ...
Страница 7: ...20 M10 swing hook 6 as standard depends on swing choices 21 8ft Fireman s Pole 1 22 9ft slide 1 ...
Страница 8: ...23 Swing varies depending on customers choice 3 as standard 24 6x60 screws 2 25 1755mm x 3 x 1 5 5 ...
Страница 14: ...Step 4 Secure a 3620mm x 4 x 2 roof support to the 40 cut on the 3m posts using decking screws ...
Страница 15: ...Step 5 Repeat steps 1 4 for the second half of the structure ...
Страница 22: ...Step 12 Repeat steps 10 and 11 for each railing ...
Страница 26: ... Repeat this for the three sides that are to be enclosed ...
Страница 31: ......
Страница 36: ...Step 26 Lower H Frame Supports Removal Remove the lower H frame supports from the tower ...