
Step 10: Railings Assembly
•
There are 6 railings in total.
Ensure to fit the railings in their correct positions depending on
the desired layout of the frame.
They should fit tightly into place between the upright posts
and on the base
•
The ‘double’ timbers on the railings should be on top and the single timber should be at the
bottom
•
Secure the bottom rail to the base using the decking screws
Содержание Hangout Climbing Frame
Страница 1: ...Hangout Climbing Frame Instruction Manual ...
Страница 5: ...12 Decking screws Approx 300 13 200mm index screws 30 14 120mm screws Approx 40 15 3620mm x 4 x 2 2 ...
Страница 6: ...16 3 6m x 3 x 1 5 2 17 1575mm x 3 x 1 5 5 18 Set of steps 1 19 Screw covers Approx 20 ...
Страница 7: ...20 M10 swing hook 6 as standard depends on swing choices 21 8ft Fireman s Pole 1 22 9ft slide 1 ...
Страница 8: ...23 Swing varies depending on customers choice 3 as standard 24 6x60 screws 2 25 1755mm x 3 x 1 5 5 ...
Страница 14: ...Step 4 Secure a 3620mm x 4 x 2 roof support to the 40 cut on the 3m posts using decking screws ...
Страница 15: ...Step 5 Repeat steps 1 4 for the second half of the structure ...
Страница 22: ...Step 12 Repeat steps 10 and 11 for each railing ...
Страница 26: ... Repeat this for the three sides that are to be enclosed ...
Страница 31: ......
Страница 36: ...Step 26 Lower H Frame Supports Removal Remove the lower H frame supports from the tower ...