![Nexxt Solutions NPC-T27U66B Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/nexxt-solutions/npc-t27u66b/npc-t27u66b_instructions-manual_1684752009.webp)
Equipment installation
The enclosure is now assembled and ready for equipment
installation.
1. Do not install any equipment until you have stabilized the
structure.
2. Always load the heavier items at the bottom first, followed by the
lighter equipment at the top of the enclosure, for safety reasons.
3. Identify the second and third square holes from the front (left and
right) and rear (left and right) ends and insert an M6 cage nut in
each opening, with the tabs facing inward.
4. Repeat this procedure until all M6 cage nuts are installed in the
square holes of the front and back rails.
5. Proceed to insert the M6x12mm phillips-head screws and plastic
washers from the inside through the vertical mounting rails and into
the nuts you installed in the previous step.
10
M6 cage nuts (20, 30 or 40)
M6 plastic washers (20, 30 or 40)
M6x12mm phillips-head
screws (20, 30 or 40)
29
27
28
LIGHT
HEAVY
LAST
FIRST
6. Finish by tightening the screws to secure the equipment inside
the enclosure.
Note: the square holes on the vertical rails are numbered to easily
identify each mounting point.
9
Grounding cables with terminal
rings (3 sets with copper split
and flat washers)
M4 self-tapping screw (1)
24
13
Grounding connection
1. Connect the first grounding cable to the door using the provided
hardware.
2. Likewise, connect the other end of the grounding cable to the
grounding post of the bottom tray using the hardware provided.
3.Next, connect the second grounding cable to the grounding post of
the rear door on the left side.
4. Then connect the other end of the grounding cable to the
grounding post of the bottom tray.
5. Repeat the same step for the door of the right side.
Note: fully-tighten the screws only after all the screws have been
inserted.
15
16
Содержание NPC-T27U66B
Страница 10: ...19 20 Notes Notes ...
Страница 11: ......