Vertical rails (4)

Installation of vertical rails  

1. Using the structure with the beam subassembly, count up the 
number of square holes on the beam from the front and rear ends 
as needed, and insert two M6 cage nuts in each opening, with the 
tabs facing inward.

2. Repeat this procedure until the first twelve (12) cage nuts are 
installed on the left side.

3. Next, identify the 2 vertical perforated mounting rails.

4. Position the perforated mounting rails upright, so as to have the 
number of rack units stamped from high (top) to low (bottom) on 
each column.

Note:

 make sure that both ends (top and bottom) of the rail are 

placed at the same level. In addition, the row of numbers on each 
vertical rail must be facing each other, on the front and rear 
sections of the unit.

5. Proceed to insert the M6 phillips-head screws and plastic 
washers from the inside through the vertical mounting rails and into 
the cage nut installed in each horizontal beam.

6. Repeat steps 1 through 5 for the right side.

Note:

 fully tighten the screws only after each pair of screws has 

been inserted.

M6 cage nuts (24)

M6 plastic washers (24)

M6x12mm phillips screws (24)

3. Secure the assembly by inserting the M6 phillips-head screws and 
washers from the inside through the horizontal beam holes and into 
the cage nuts installed in the frames. 

4. Repeat the same procedure for the installation on the right side.

5. After verifying that all beams are properly aligned, fully tighten all 
the screws fixing the horizontal beams to the frames.

6. Now the horizontal beam subassembly is ready for the next phase. 

Horizontal beam subassembly

6

3. Slide the plastic retaining latches on both sides of the panel to 
their unlock position.

4. Push side panels against the support frames and release the 
plastic retaining latches so as to re-engage them to their locked 
position.

Note:

 each side panel features a pre-install key lock for securing both 

sides of the enclosure. Insert the side panel key and turn it clockwise 
to verify that the locking mechanism is working properly. 

Installation of side panels

1. Next, identify the 2 lateral panels. Both are identical for this 
model.

2. Align the tabs located on the bottom of each side panel with the 
openings of the bottom tray. 

Vertical rail subassembly

Side panels (2)

Side panel key set (1)

8

17

11

12

Содержание NPC-T27U66B

Страница 1: ...ProfessionalSeries Semi knocked down floor cabinet NPC T27U68B NPC T32U68B NPC T37U68B NPC T42U68B NPC T42U61B NPC T47U61B NPC T27U66B NPC T32U66B NPC T37U66B NPC T42U66B ...

Страница 2: ...nt including the easy integration of rack PDUs and high density cable managers Built to EIA rack standards with square punched mounting holes the equipment can be quickly attached inside the enclosure for data center or computer room applications Enhanced cooling capabilities are made possible by the integration of a fan tray assembly Product available in 600mm wide configuration with 27 32 37 42 ...

Страница 3: ...to parts The installers may need to have the following items and tools available to assemble and install the cabinet They are not included in the box 3 Product overview and components Upon opening the box make sure to inspect and account that all the items listed below are included 1 Phillips screwdriver 2 Power drill with the following bits Phillips head tip 3 Pair of gloves 4 Long nose pliers 5 ...

Страница 4: ...ou are about to put together Open the boxes and verify that all parts hardware and accessories are included in the package Inspect the cabinet components and identify each individual part to ensure proper assembly of the unit Rack assembly hardware 32U 27U 27 37U 37 47U 18 19 20 21 M6 cage nut M6 plastic washer M6x12mm phillps head screw M8x12mm hexagon socket head screw M8 flange nut M6x12mm self...

Страница 5: ...ith brakes 2 without brakes Leveling feet 4 26 23 24 11 10 7 Installation of casters and feet 1 Identify the 2 caster wheels with brake mechanism and the 2 regular caster wheels which will be used in the back of the cabinet 2 Align the two casters with brakes with the front mounting holes of the bottom tray and secure them firmly using four 4 of the supplied M6 self tapping screws 3 Repeat the sam...

Страница 6: ...nel stoppers on the right and left sides of the structure front and rear as per the illustration below The rubber stud should be facing outwards 4 Attach the stoppers to the frames using the supplied M4 self tapping screws 2 per stopper Note at this time make sure to fully tighten all the screws FRONT FRONT REAR REAR 21 22 4 Installation of horizontal beams 1 Decide the height of the beam installa...

Страница 7: ...screws has been inserted M6 cage nuts 24 M6 plastic washers 24 M6x12mm phillips screws 24 3 Secure the assembly by inserting the M6 phillips head screws and washers from the inside through the horizontal beam holes and into the cage nuts installed in the frames 4 Repeat the same procedure for the installation on the right side 5 After verifying that all beams are properly aligned fully tighten all...

Страница 8: ...anism is working properly Split mesh rear door with lock 1 Hinge bushings 2 FRONT REAR 7 3 25 16 Rear door key set 1 Front door assembly 1 Identify the front door bushing and pivot pins 2 Insert the bushing into the pivot pin at the bottom of the door and hold it in place 3 While supporting the door align the bottom pivot pin with the hinge hole on the frame until it latches into position 4 Pull d...

Страница 9: ...6 cage nuts 20 30 or 40 M6 plastic washers 20 30 or 40 M6x12mm phillips head screws 20 30 or 40 29 27 28 LIGHT HEAVY LAST FIRST 6 Finish by tightening the screws to secure the equipment inside the enclosure Note the square holes on the vertical rails are numbered to easily identify each mounting point 9 Grounding cables with terminal rings 3 sets with copper split and flat washers M4 self tapping ...

Страница 10: ...19 20 Notes Notes ...

Страница 11: ......

Отзывы: