![Nexxt Solutions NPC-T27U66B Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/nexxt-solutions/npc-t27u66b/npc-t27u66b_instructions-manual_1684752007.webp)
6
20
18
19
5
Vertical rails (4)
Installation of vertical rails
1. Using the structure with the beam subassembly, count up the
number of square holes on the beam from the front and rear ends
as needed, and insert two M6 cage nuts in each opening, with the
tabs facing inward.
2. Repeat this procedure until the first twelve (12) cage nuts are
installed on the left side.
3. Next, identify the 2 vertical perforated mounting rails.
4. Position the perforated mounting rails upright, so as to have the
number of rack units stamped from high (top) to low (bottom) on
each column.
Note:
make sure that both ends (top and bottom) of the rail are
placed at the same level. In addition, the row of numbers on each
vertical rail must be facing each other, on the front and rear
sections of the unit.
5. Proceed to insert the M6 phillips-head screws and plastic
washers from the inside through the vertical mounting rails and into
the cage nut installed in each horizontal beam.
6. Repeat steps 1 through 5 for the right side.
Note:
fully tighten the screws only after each pair of screws has
been inserted.
M6 cage nuts (24)
M6 plastic washers (24)
M6x12mm phillips screws (24)
3. Secure the assembly by inserting the M6 phillips-head screws and
washers from the inside through the horizontal beam holes and into
the cage nuts installed in the frames.
4. Repeat the same procedure for the installation on the right side.
5. After verifying that all beams are properly aligned, fully tighten all
the screws fixing the horizontal beams to the frames.
6. Now the horizontal beam subassembly is ready for the next phase.
Horizontal beam subassembly
6
3. Slide the plastic retaining latches on both sides of the panel to
their unlock position.
4. Push side panels against the support frames and release the
plastic retaining latches so as to re-engage them to their locked
position.
Note:
each side panel features a pre-install key lock for securing both
sides of the enclosure. Insert the side panel key and turn it clockwise
to verify that the locking mechanism is working properly.
Installation of side panels
1. Next, identify the 2 lateral panels. Both are identical for this
model.
2. Align the tabs located on the bottom of each side panel with the
openings of the bottom tray.
Vertical rail subassembly
Side panels (2)
Side panel key set (1)
8
17
11
12
Содержание NPC-T27U66B
Страница 10: ...19 20 Notes Notes ...
Страница 11: ......