
15
21
22
Assembling the Cable Management System
For these steps you will need the following parts:
Cable Management Track
Screen Support
Actuation System
(4) 5 x 12 mm FHMS Screws
(4) 6 x 10 mm BHMS Screws
4.5m Motor Cable
6’ Adapter Cable
Small Hex Key
3 mm Hex Key
Snakeskin Wrap
Step 21:
Attach the Cable Management Track to the Center Riser Bracket using
(2) 5 x 12mm FHMS Screws.
Step 22:
Connect the 4.5m Motor Cable to the Center Lift Column.
Содержание L-75s
Страница 1: ...1 TV Lift System Model L 75s Installation Instructions...
Страница 30: ...30...
Страница 32: ...32 Connecting the Lift to your Home Control System...
Страница 33: ...33 Intentionally Left Blank...
Страница 34: ...34 Intentionally Left Blank...
Страница 35: ...35 Intentionally Left Blank...
Страница 36: ...36 866 500 5438...