RIGGING PROCEDURE
Page
49/93
4 push-pins (BLGEOD, 10mm diameter x 20 mm length) connect the top GEO SUB to the bumper.
•
Position the bumper on the first GEO SUB by lifting or lowering bumper assembly with motor
hoists;
•
Link the GEO SUB to the bumper assembly using the four 10mm x 20mm push-pins; front
bumper connects at GEO SUB front articulation point, rear bumper connects at “LIFT” GEO SUB
rigging plates holes;
•
Check that all push-pins are in their locked position.
•
Ensure that no objects have been placed accidentally on the top of the bumper as they may fall
when the system is lifted.
"LIFT" POINT
"LIFT" POINT
"LIFT" POINT
"LIFT" POINT
FIRST GEO SUB TO BUMPER ASSEMBLY
“LEFT“
CONFIGURATION
“RIGHT“
CONFIGURATION
5.6.3 First to second GEO SUB
4 push-pins (BLGEOD, 10mm diameter x 20 mm length) connect first to second GEO SUB, 2 additional
push pins-are required for angle adjustment.
FIRST TO SECOND GEO SUB