RIGGING PROCEDURE
IMPORTANT
DO NOT attempt to make any changes to the angle adjustements when the compression
pull-up force is applied.
5.4.7 Positioning the cluster
•
Adjust the bumper angle as determined in GeoSoft2 by rotating the lever from the bottom of the
cluster ;
•
Check all GEO D angles with an inclinometer;
•
Lift the GEO D array to the height determined in GeoSoft2 (GeoSoft2 array height definition is for
the top edge of the topmost cabinet);
•
Once the bumper is in definitive position a secondary safety steel must be fitted (this secondary
safety steel should link the bumper to a suitable point in the supporting structure);
IMPORTANT
The requirements for secondary safety systems vary with territories. However, the
secondary safety steel MUST have a SWL equivalent to or greater than that of the rigging
system.
APPLYING COMPRESSION AND SETTING BUMPER ANGLE