coupling
connector
e
Clean and lubricate* both female tee connector interface and male interface of the coupling connector.
r
Push the coupling connector on to the contact rod of the tee connector. Take care not to damage the contact rod
during installation of the coupling connector.
22 mm
socket
1/2" - 12,7 mm
torque wrench
L ≥ 130 mm
extension
coupling
connector
22mm
* USE ONLY THE SILICONE LUBRICANT SUPPLIED
50 Nm
contact
rod
equipment
bushing
lubricate
equipment
bushing
clamping
screw
t
Insert the clamping screw into the threaded hole of the contact rod
by hand.
y
Use torque wrench with extension and a 22 mm socket and tighten exerting
50
Nm (5 kgm or 36,9 foot-pounds) of
torque.
In order to achieve the correct applied torque ensure that there is no lubricant on the threaded
parts.
Proceed with installing the basic insulation plug on page 13.
Type 1: clamping screw
Page 11 of 14
IS97180-ENG - K800PB/G
-CW45-
CA0 - Revision 2
For
information
only