1.5mm
3x12mm screw
2mm
2x15mm
screw
! Engine thrust on balk head
is already adjust at factory
! Align the mark on both engine mount
beams with the mark on the firewall.
A
FRONT-VIEW
Using a pencil or felt tipped pen, mark the fire wall where the four holes are to
be drilled.
Carefully remove the engine mount beams and drill a 5mm hole through the
fire-wall at each of the four marks made above.
Attach the engine mount beams onto the fire-wall so the distance between of two engine mount beams is “A”.
Secure the engine mount beams onto the fire-wall with litter CA glue.
B
B’
B=B’
A
Mark on the firewall
Mark on the firewall
5mm
15- Tail wheel
16- Glow engine