background image

5

15272 Newsboy Circle
Huntington Beach
California 92649

                              

  

Phone:  714-751-0488  

                                     Fax: 714-856-9679 

     E-Mail: [email protected]

PoweringTheNetwork.com

additional stainless steel flat washer and lock washer set for proper installation of the second lug.
An elongated hole is provided directly behind the round hole to accommodate a second post for double hole wire lugs. 

This hole will accept either 1/4" or 5/16" hardware also and the rear post at each position is adjustable for center-to-center 

hole spacing between 3/4" and 1".

2)

 System or load ground wires are typically attached to the provided BBA bus bar, which has an assortment of hole sizes 

to suit most terminal requirements.
Refer to the output wiring recommendations of the instruction manual which accompanies the power modules for proper 

PFM input wire gauges.

3)

 A return/ground wire must also be run from the BBA bus bar (or other grounding point) to the terminal on the PFM 

labeled “RETURN/GND”. This is not a system ground; rather, it is a reference ground for the PFM’s volt/amp meter and low 

voltage battery disconnect. 

Note: Do not confuse this post with the chassis grounding point on the left rear of the PFM.

 Wiring 

for the return/ground wire should be 12 or 14 AWG.

Note: When paralleling multiple early model NEWMAR Power Modules (PM-12-70, PM-24-35, or PM-48-18), use (+) Positive and (-) 
Negative V OUT terminals only. Do not use V2 terminal.

E) Output Wiring

Output may be taken from a single unswitched output terminal or via up to five switched outputs. Installation of an 

optional circuit breaker (available from NEWMAR) is required for each switched output. (See section E Circuit Breaker 

Installation.) Refer to FIGURE 4 for the Output and Battery Wiring sections which follow.

FIGURE 4: Typical PFM DC Output and Battery Wiring

 

Содержание PFM-500

Страница 1: ...ng E Output Wiring 5 1 Unswitched Output 2 Switched Output F Battery Wiring 6 G Status and Alarm Contact Wiring 7 H Chassis Grounding 8 I Circuit Breakers 8 1 Breaker Installation 2 Breaker Functions...

Страница 2: ...TERY POSITIVE NEGATIVE OR FLOATING GROUND STATUS CONTACTS RETURN GND INPUT 1 INPUT 2 INPUT 3 LVD SUMMARY ALARM OUTPUT INPUT 4 INPUT 5 INPUT 6 NC NO C CONTACTS SHOWN IN FAILED POSITION 1 2 3 1 2 3 1 2...

Страница 3: ...osing flush mounting C Bus Bar Mounting The PFM is shipped with a rackmount ground bus bar assembly kit BBA 800 The bus bar is typically mounted on the rear of the rack and is designed for installatio...

Страница 4: ...Hot Wire to POSITIVE OUTPUT Terminal Positive Ground Systems Connect Ground Wire to POSITIVE OUTPUT Terminal and Hot Wire to NEGATIVE OUTPUT Terminal Power Plugs shown present only if using NEWMAR QC...

Страница 5: ...for proper PFM input wire gauges 3 A return ground wire must also be run from the BBA bus bar or other grounding point to the terminal on the PFM labeled RETURN GND This is not a system ground rather...

Страница 6: ...s requires installation of a model PBA plug in breaker available from NEWMAR at that position See section II I Fig 7 for installation details and breaker functions See section VII for available ampera...

Страница 7: ...ness is designed for installations which employ NEWMAR Power Modules though it may be modified for use with other types of equipment as well provided they are equipped with Form C or Normally Open N O...

Страница 8: ...nd a summary alarm from the DST is required this may be accomplished through parallel wiring of the status wires Please contact the factory for information on how to perform this modification When wir...

Страница 9: ...reaker receptacle and pushing firmly into place The two top auxiliary contact terminals in the middle of the breaker should press against the mating clips The bottom auxiliary contact is unused in thi...

Страница 10: ...e or the battery side by using the selector switch on front panel Powering the meter from the rectifier side default causes the PFM 500 to completely shutdown during a Low Battery Voltage Disconnect t...

Страница 11: ...8 Fax 714 856 9679 E Mail techservice newmarpower com PoweringTheNetwork com C LCD Display 1 Digital Meter Programming Sequence Flow Chart Figure 8 Digital Meter Programming Sequence Flow Chart see pa...

Страница 12: ...voltage disconnect Screen press programming button to enter set mode rotate knob to change push to confirm setting See page 13 for detailed directions 4B LVD voltage connect Screen press programming...

Страница 13: ...ngs and is retained even after powering down the unit LVD threshold adjustment can be made while the system is operating 3 LVD Alarms Pre disconnect disconnect Two external alarms can be triggered by...

Страница 14: ...Section III D for LVD adjustment procedure 4 PFM load circuit breaker tripped Breaker is in mid trip position Note Breaker will not activate the ALARM L E D if manually switched into the off position...

Страница 15: ...power com Anytime We are happy to consult with you to resolve any problems or questions you may have If during consultation it appears the PFM must be returned to the factory for repair we will issue...

Страница 16: ...low TEMPERATURE RATING 0 C to 60 C CASE SIZE H x W x D 3 5 x 19 or 23 x 20 5 LVD SPECIFICATIONS Factory set actuation voltages 12 Volt 24 Volt 48 Volt Disconnect 10 4V DC 21 0V DC 42 0V DC Connect 12...

Отзывы: