1
15272 Newsboy Circle
Huntington Beach
California 92649
Phone: 714-751-0488
Fax: 714-856-9679
E-Mail: [email protected]
PoweringTheNetwork.com
Power Function Manager
MODEL: PFM-500
INSTALLATION / OPERATION MANUAL
SECTION
TOPIC
PAGE
I)
OVERVIEW............................................................................. 3
II)
INSTALLATION...................................................................... 3
A)
Materials
Provided...............................................
3
B)
PFM
Mounting......................................................
3
C) Bus Bar Mounting................................................. 3
D) Input Voltage Selection (Universal) and Wiring.. 3
1)
Simplified
Wiring
Option
DC Quick Connect Wiring Kit
2)
Standard
Wiring
E)
Output
Wiring........................................................
5
1)
Unswitched
Output
2)
Switched
Output
F)
Battery
Wiring........................................................
6
G) Status and Alarm Contact Wiring........................ 7
H)
Chassis
Grounding................................................
8
I)
Circuit
Breakers......................................................
8
1)
Breaker
Installation
2)
Breaker
Functions
III)
FRONT PANEL INDICATORS, DISPLAY AND SETTINGS........ 10
A)
Setttings................................................................
10
1) Meter Power Source Selector Switch
2)
LVD
Switch
B)
INDICATORS..........................................................11
1)
Alarm
LVD
C) LCD DISPLAY.........................................................11
1) Screen Selection Flow Chart
2) Programming Sequence
D) LVD Operation and Programming...................... 13
1) Manual/Auto Selecor Switch
2) LVD Adjustment
3) LVD Alarms
4) LVD Voltage Sequencing Example
IV)
TROUBLESHOOTING..............................................................14
V) SPECIFICATIONS...................................................................16
VI)
BREAKER SPECIFICATIONS/ORDERING GUIDE....................16
M-PFM500
As of 112818