4 - OPERATING INSTRUCTIONS
Right-hand lift rod adjustment
NOTICE:
The right-hand lift rod is readily adjustable even when connected between the lift arm and lower link.
To lengthen or shorten the right-hand lift rod
(1)
loosen jam
nut
(2)
and rotate lift rod clockwise to reduce the length
and counter-clockwise to increase the length.
NHIL12CT00803AA
2
Top link adjustment
To adjust the top link length, loosen the jam nut
(1)
. Hold
the link end
(2)
and rotate the handle
(3)
on the sleeve to
lengthen or shorten the top link. After adjustment tighten
the jam nut to prevent unwanted rotation of sleeve when
in use.
NHIL12CT00805AA
3
4-6
Содержание Workmaster 25 Tier 4B
Страница 74: ...3 CONTROLS AND INSTRUMENTS 3 28 ...
Страница 102: ...4 OPERATING INSTRUCTIONS 5 Engage the park brake 7 and release the brake ped als slowly NHIL12CT00691AA 6 4 28 ...
Страница 110: ...5 TRANSPORT OPERATIONS 5 8 ...
Страница 116: ...6 WORKING OPERATIONS 6 6 ...
Страница 155: ...7 MAINTENANCE NOTE Approximate fluid capacity for the front axle housing is 5 5 l 5 8 US qt 7 39 ...
Страница 158: ...7 MAINTENANCE Valves Check Contact your NEW HOLLAND dealer to schedule this service for your tractor 7 42 ...
Страница 178: ...8 TROUBLESHOOTING 8 6 ...
Страница 187: ...9 SPECIFICATIONS NHIL12CT00862HA 1 9 9 ...
Страница 188: ...9 SPECIFICATIONS 9 10 ...
Страница 190: ...10 ACCESSORIES 10 2 ...