4 - WORKING OPERATIONS
If the pile sides are too high and likely to cause cave-in,
use the loader to break down the sides until a slot can be
cut over the top.
NHIL13CT00874AA
14
Another effective method of loading from large dirt piles is
to build a ramp approach
NHIL13CT00875AA
15
NOTE:
Keep the bucket level when approaching a bank
or pile to help prevent gouging the work area.
NHIL13CT00876AA
16
Peeling and scraping
Use a slight bucket angle, travel forward, and hold the lift
control forward to start the cut. Make a short angle cut
1.5
– 2.4 m
(
5 – 8 ft
) and break out cleanly.
(1) 152 mm
(
6.0 in
).
NHIL13CT00877AA
17
4-6
Содержание 140TL
Страница 4: ......
Страница 32: ...2 SAFETY INFORMATION Safety features See 1 14 for safety feature description of the park stand 2 14...
Страница 50: ...3 OPERATING INSTRUCTIONS 3 18...
Страница 62: ...4 WORKING OPERATIONS 4 12...
Страница 70: ...5 MAINTENANCE 5 8...
Страница 72: ...6 TROUBLESHOOTING 6 2...
Страница 80: ...8 ACCESSORIES 8 2...
Страница 85: ......