41
OptiView XG Network Analysis Tablet
Getting Started Guide
The
OptiView Power Control
screen will appear, as shown.
2. Switch off
Wireline Ports A, B, C, and D
. This will approximately double battery
operation time.
3.The system must reboot to make the change. Select the
Save and Restart
button.
NOTE
Remember to switch on Wireline Ports A, B, C, and D before attempting to use the Network Ports!
Содержание OptiView XG
Страница 10: ...4 Introduction Figure 1 OptiView XG Network Analysis Tablet with 10 100 1000Mbps 10Gbps Wired Enabled...
Страница 71: ...65 OptiView XG Network Analysis Tablet Getting Started Guide...
Страница 73: ...67 OptiView XG Network Analysis Tablet Getting Started Guide...
Страница 77: ...71 OptiView XG Network Analysis Tablet Getting Started Guide...