SKS - Steam to Steam Humidifier
Installation Instructions and User Manual
18
Stage 3
– Pipework for HTHW / Raw steam
Positioning the Control Valve
Install the actuated valve between 20 to 30 degrees from vertical in order to
reduce the convection heat to the actuator.
(Fig. 16)
A
A
B
A
A
B
STEAM SUPPLY SIDE
FLOW DIRECTION
VALVE BODY
ELECTRIC
ACTUATOR
20-30º
Содержание SKS-100-SLP
Страница 38: ...Notes...
Страница 39: ......