SKS - Steam to Steam Humidifier
Installation Instructions and User Manual
12
Stage 2
– Steam Distribution Pipes Positioning & Installation
Selection of
Multi-Steam
1.
For all Multi-Steam units, use the Neptronic Humidisoft program to size the unit.
2.
Where two Multi-Steam units are required, duties in excess of 240kg/h make
your selection using the following rules:
Divide the air volume flow in half.
Divide the AHU / air duct
width
in half.
Height
of the duct must remain at 100% its height.
This will size Multi-Steam units so that they can be placed side by side.
3.
For installation of Multi-Steam units please refer to Neptronic® Multi-Steam
Installation Instructions
Horizontal duct (Fig. 9)
Vertical duct (Fig. 10)
Ø15mm
Static pressure
+ 50mm
M
in
.
5
0
m
m
Min. 50 mm
Min. 50 mm
Mounting bracket must be level horizontally
Steam supply hose or
rigid pipe to Humidifier
Header must be pitched toward condensate drain
Condensate drain pipe to steam trap
Air duct
Rod, bolt, nut and
washer assembly
A
ir
fl
o
w
Steam supply hose or
rigid insulated pipe
to Humidifier (by others)
Air duct
Rod, bolt, nut and washer
assembly (by others)
Condensate drain pipe
(by others)
Neptronic
Humidifier
A
ir
fl
o
w
10% slope is integrated
in header design
Static pressure
+ 50mm
Содержание SKS-100-SLP
Страница 38: ...Notes...
Страница 39: ......