NENO LEADX Ultra Manual
© NENO-CNC Schweiz 2023
Seite | 40
3.1.5 Preparation of the substructure completed.
Note that the fixed side is on the right; these brackets are all flush with the end of the profile and
fully tightened. The brackets on the left side are still movable and will later be positioned and
tightened according to the X-axis mounting.
Содержание LEADX Ultra
Страница 34: ...NENO LEADX Ultra Manual NENO CNC Schweiz 2023 Seite 34 2 7 2 Completed Y1 and Y2 axes Y axis Y1 Y axis Y2...
Страница 80: ...NENO LEADX Ultra Manual NENO CNC Schweiz 2023 Seite 80 4 6 X axis complete...
Страница 96: ...NENO LEADX Ultra Manual NENO CNC Schweiz 2023 Seite 96...
Страница 99: ...NENO LEADX Ultra Manual NENO CNC Schweiz 2023 Seite 99 5 7 Z axis complete...