
Performance Verification
N5500 Service Manual 27
Performance
Verification, N5500
3. Connect the patient test lead combination in table 7 to the appropriate input connector
on the electrical analyzer.
4. Turn on the N5500.
5. Perform patient auxiliary current test per table 8 as recommended by electrical
analyzer’s operating instructions.
6. Repeat the patient auxiliary current test for each test lead combination as listed in
Table 7 and measure each patient auxiliary current.
Table 7. Test Lead Combinations
First Test Lead
Second Test Lead
ECG #1 (LA)
ECG #3 (RA)
ECG #1 (LA)
ECG # 2 (LL)
ECG #2 (LL)
ECG #3 (RA)
ECG #1 (LA)
Temperature 1/2
ECG #2 (LL)
Temperature 1/2
ECG #3 (RA)
Temperature 1/2
ECG #1 (LA)
SpO
2
ECG #2 (LL)
SpO
2
ECG #3 (RA)
SpO
2
Temperature 1/2
SpO
2
Table 8. Allowable Leakage Current
Polarity
Neutral Line
Wire
Power Line
Ground Wire
Allowable Leakage
Current (microamps )
Normal
Closed
Normal
10
Normal
Open
Normal
50
Normal
Closed
Open
50
Reversed
Closed
Normal
10
Reversed
Open
Normal
50
Reversed
Closed
Open
50
Содержание OxiMax N 5500
Страница 1: ...Service Manual Patient Monitor...
Страница 7: ......
Страница 35: ......
Страница 43: ......
Страница 75: ...Spare Parts 68 N5500 Service Manual Disassembly Guide Spare Parts N5500 Figure 8 N5500 Exploded View...
Страница 87: ......
Страница 100: ......