VAC 12/20
EN
28
9
Maintenance
Read Chapter ‘3 Safety’ before carrying out maintenance.
It is recommended to install an hour service meter in the start and control unit.
NOTE!
The intervals in this chapter are based on the unit being professionally
maintained.
WARNING!
Risk of electric shock.
Work with electric equipment must be carried out by a qualified electrician.
WARNING!
Risk of personal injuries.
Use proper protective equipment when risking exposure to the dust.
WARNING!
Risk of electric shock.
Always disconnect the supply voltage before any servicing, whether
mechanical or electrical. Always lock any maintenance switch in the off
position.
WARNING!
Risk of personal injury.
Ensure that no vacuum is present in the system during service.
WARNING!
Risk of burn injury.
Make sure the unit is cool before undertaking an inspection to avoid burn. The
unit and its parts can get very hot.
9.1
General inspection
Perform the following general inspection every 500 hours of operation:
•
Inspect the incoming connections. Ensure all cables and hoses are tightly
fitted.
•
Check for signs of corrosion or other damage.
•
Check that the ventilation inlet and outlet of the unit are clear.
•
Check that the ventilation to the room is clear (if placed indoors).
•
Check for dust or collected material inside the unit. Dust or collected
material may indicate a filter malfunction.
9.2
Belt transmission
Perform the following belt transmission inspection every 500 hours of
operation:
1.
Remove the belt guard.
2.
Remove the motor side panel for easy access to the screws that anchor the
motor.
3.
Replace worn or damaged belts and pulleys.
4.
Check the tension of the belt transmission and adjust if required.
The following figures can serve as a guide for all VAC models and give
the force F necessary to apply to one of the belts as shown in Figure 15 for
10 mm slack:
–
New belts: F=24 N (5.4 lbf)
Содержание VAC 12
Страница 2: ...VAC 12 20 2...
Страница 8: ...VAC 12 20 8 Figures 4 5 6 7 8 9 10 3 2 1 1 2 3 4 5 6 7 8 1 2 3 1 1 2 4 3...
Страница 11: ...VAC 12 20 11 35 ml ATF 70 85 mm X U1 V1 W1 W2 U2 V2 X 10 11 12 14 13 10mm 0 39 15...
Страница 12: ...VAC 12 20 12 16 1 6 7 5 4 3 2 17 18...
Страница 56: ...VAC 12 20 CS 56...
Страница 141: ...VAC 12 20 141 ET...
Страница 224: ...VAC 12 20 IT 224...
Страница 246: ...VAC 12 20 NL 246...
Страница 290: ...VAC 12 20 PL 290...
Страница 315: ...VAC 12 20 315 RU 1 3 EC Nederman Nederman 2...
Страница 321: ...VAC 12 20 321 RU 4 4 5 5 VAC 20 VAC 20 1 8 79 C 174 F 60 C 140 F 5 2 1 5 6 VAC 20 110 C 230 F 7 VAC 20 24 5 7 7...
Страница 324: ...VAC 12 20 RU 324 2 1 5 1 7 1 2 7 1 3 4 1 VAC 12 20 5 16 5 7 2 8...
Страница 325: ...VAC 12 20 325 RU 8 VAC 12 20 8 1 7 1 1 6 9 Nederman 8 2 8 2 1 1 2 1 2 3 4...
Страница 326: ...VAC 12 20 RU 326 8 2 2 Y D Y D D Y Y D D 8 2 3 30 8 2 4 Ie 10 100 10 100 A 21 19 DIN Ie Ie min Ie max UN R MIN Ie min...
Страница 328: ...VAC 12 20 RU 328 9 1 500 9 2 500 1 2 3 4 VAC F 15 10 F 24 5 4 F 20 4 5 5 6 50 100...
Страница 332: ...VAC 12 20 RU 332 A 7 1 7 1 7 2 1 4 1 0 7 7 2 1 5 2 7 1 1 5 2 5 2 7 1 VAC 12 20 7 1 3 7 1 3 ISO 8573 1 5 7 1 3 7 1 3...
Страница 333: ...VAC 12 20 333 RU 7 1 3 8 1 8 1 8 1 8 2 Y 8 2 D 8 2...
Страница 334: ...VAC 12 20 RU 334 B 9 1 9 1 9 1 9 2 9 2 9 2 9 3 VAC 20 9 4 9 5 FR 160 9 5 2 9 6 9 7 9 8 9 8 9 8 5 8...
Страница 355: ......
Страница 356: ...www nederman com...