background image

TECHNICAL MANUAL “ Brio Easy serving Espresso“ 

  

Manual Brio ESE 

 

10 / 

17 

5 - BREWER UNIT FOR COFFEE PODS 

 

The adopted brewer unit is used to brew coffee exclusively by means of 

continuous strip “ESE” pods (servings) with 100/200 doses. The pods 

are made up with an optimum coffee dose. 
The unit works as follows: 

When a selection is made the serving drive motor positions the pod in 

the brewing zone under the flow-through boiler. The unit motor lifts the 

piston until hermetically closing the brewing chamber. 

The three-way solenoid valve is opened so that the pressure boiler is 

connected to the flow-through boiler located above the brewer unit. 

The pressure boiler maintains the water at a temperature of 
approximately 80° C (ideal for instant products) and the flow-through 

boiler heats it up to 95-100° C (ideal for espresso coffee). 

 

 

 

 

The brewing chamber is kept hot at 
the same temperature of the flow-

through boiler. 

The pump delivers the programmed amount of water that is accurately 

computed by the volumetric counter. At the end the three-way solenoid 

valves are closed and the water still in the flow-though boiler is expelled 

through the third way of the valve. Then the unit motor is activated, 

lowering the piston until opening the brewing chamber. 

The “serving” drive motor is started, dragging the serving out of the 
brewing chamber. 

At this point the unit is ready for a new selection. 

In order to maintain the correct temperature up to the dispensing point, a 

special tube heated by a special permanent low-consumption heating 

element is used. 

 

 Pod strip drive motor 
Unit drive motor 

Inner piston 

Three-way solenoid valve 

Pod strip (Serving) drive roller 

Microswitches 

 

 
 
 
 
 
 
 

Rear view of brewer unit 

 

 

 

“Flow- through”  

Boiler  

Brewing 

unit 

Heated tube 

Heated tube power 

supply cable 

Содержание BRIO "Easy Serving Espresso"

Страница 1: ...NUAL Brio Easy serving Espresso Manual Brio ESE 1 17 by AFTER SALES SERVICE Hot Cold Brio Easy Serving Espresso BASIC TECHNICAL MANUAL THE CONTENTS OF THIS DOCUMENT ARE INTENDED FOR NECTA S AFTER SALE...

Страница 2: ...r open Table of Contents 1 2 3 4 5 6 7 8 9 Layout Electrical systems and board connections Air break Boilers Pumps and by pass Coffee brewer unit Mixer Unit Powder and water dose tables Trouble shooti...

Страница 3: ...alve 8 Flow through Espresso boiler 2 Mechanical filter for impurities 9 Flow through coil 3 Air break 10 Three way solenoid valve 1 4 Volumetric counter 11 Three way solenoid valve 2 5 Vibration pump...

Страница 4: ...me compartment and controlling the flow through espresso boiler see photo Two other boards are installed 1 The display board which processes the information from the CPU board and converts it into rea...

Страница 5: ...e serial interface 9 Front validator connector 10 Jp1 11 Coin return lamp 12 NOT USED 13 MDB board power supply 14 MDB coin mechanism connector 15 Programming mode button CPU board component legend Re...

Страница 6: ...relief solenoid valve 2 K3 Instant drink solenoid valve 2 K4 Pump K5 Coffee brewer motor K6 Instant drink solenoid valve 2 K7 Pod strip Serving drive motor K8 Mixer motor 1 K9 Doser device 3 K10 Dose...

Страница 7: ...upporting 512 Kb and 1 Mb EPROMs by setting Jumpers JS3 and JS4 For the different configurations see the following tables LANGUAGE CONFIGURATION LANGUAGE Minidip Italian French Spanish 6 OFF ON OFF 7...

Страница 8: ...t and microswitch When a coffee selection is made after positioning the pod in the brewing chamber the pressure boiler two way solenoid valves is opened and the vibration pump is started for a length...

Страница 9: ...the coffee pod and thus ensuring better dispensed product quality To ensure greater pump reliability and better tightness against the pressure a check valve was added at the boiler inlet this way no...

Страница 10: ...p to 95 100 C ideal for espresso coffee The brewing chamber is kept hot at the same temperature of the flow through boiler The pump delivers the programmed amount of water that is accurately computed...

Страница 11: ...to the brewer after removing the keys 1 front and if necessary back this way access is gained to the lower filter using a screwdriver lift the edge until removed completely Clean and descale using su...

Страница 12: ...e system is adjusted to the optimum setting at the factory however in the event of disassembly for cleaning and or replacing filters and gaskets it may be necessary to readjust the settings in this ca...

Страница 13: ...Dispensing time 18 to 20 seconds Coffee water dose 35 to 40 cc ADJUSTING THE INSTANT BOILER WATER TEMPERATURE The instant boiler has a dual function it provides hot water for all instant products by m...

Страница 14: ...te 7 5 gr Instant Coffee Optional Time Quantity 1 3 gr 22 55 cdv 40c c 7 5 gr Chocolate Time Quantity 32 116 cdv 90 c c 23 28 gr Instant tea Time Quantity 32 116 cdv 90 c c 12 14 gr Milk Time Quantity...

Страница 15: ...e Overheating protection triggered For the espresso boiler melted thermo fuse The vending machine is locked if the set temperature is not reached within 10 minutes Check the correct operation of the h...

Страница 16: ...failure If the ere is no communication between coin mechanism and CPU board for 30 seconds for serial coin mechanisms only Check for correct connection and configuration of the minidips if all correct...

Страница 17: ...TECHNICAL MANUAL Brio Easy serving Espresso Manual Brio ESE 17 17 9 WIRING DIAGRAMS...

Отзывы: