Plywood should first be installed on the wall where the Battery Box will be positioned. This allows secure
anchoring of the screws which support the weight of the Battery Box.
1.
Using four supplied screws, secure the WM Support to the FM/WM Base-F and Base-R.
Four Screws
(M4 X 8)
WM Support
FM/WM Base-R
FM/WM Base-F
Figure 2-43 Assemble Battery Box Base
2.
Refer to
Figure 2-44 Wall-Mount Spacing Guide on page 2-31
for required spacing before drilling
holes for 10 mm anchor bolts (locally procured).
Mark and drill the four holes required to install the FM/WM Base.
SL1000
ISSUE 3.0
2-30
Installation
Содержание SL1000
Страница 1: ...Hardware Manual A50 031170 001 GE ISSUE 3 0 November 2012...
Страница 12: ...MEMO SL1000 ISSUE 3 0 x Hardware Manual...
Страница 16: ...MEMO SL1000 ISSUE 3 0 R 4 Regulatory...
Страница 126: ...MEMO SL1000 ISSUE 3 0 3 8 System Start Up...
Страница 140: ...MEMO SL1000 ISSUE 3 0 4 14 Maintenance...
Страница 149: ...MEMO ISSUE 3 0 SL1000 Hardware Manual 5 9...
Страница 150: ...Hardware Manual NEC Corporation ISSUE 3 0...