13. Plug the Battery Connection Cable into the Fuse unit.
Fuse unit
Battery Connection
Cable
Figure 2-37 Connecting the Battery Connection Cable
14. Align tabs a to f to holes A to F on Battery Box. Slide the Front cover and tighten the two screws.
b
a
A
B
C
D
E
F
c
d
e
f
Front cover
Two screws
(with stopper)
Figure 2-38 Installation of Front Cover
2.6 Mounting the IP4WW-Battery Box
The IP4WW-Battery Box can be installed on either the floor or wall. One KSU can be mounted on an
IP4WW-Battery Box.
2.6.1 Floor-Mounting the IP4WW-Battery Box
Battery box can be mounted on the floor using the FM/WM Base-F, FM/WM Base-R and WM Support.
(Note: FM = Floor-Mount and WM = Wall-Mount)
ISSUE 3.0
SL1000
Hardware Manual
2-27
Содержание SL1000
Страница 1: ...Hardware Manual A50 031170 001 GE ISSUE 3 0 November 2012...
Страница 12: ...MEMO SL1000 ISSUE 3 0 x Hardware Manual...
Страница 16: ...MEMO SL1000 ISSUE 3 0 R 4 Regulatory...
Страница 126: ...MEMO SL1000 ISSUE 3 0 3 8 System Start Up...
Страница 140: ...MEMO SL1000 ISSUE 3 0 4 14 Maintenance...
Страница 149: ...MEMO ISSUE 3 0 SL1000 Hardware Manual 5 9...
Страница 150: ...Hardware Manual NEC Corporation ISSUE 3 0...