Connect Power Cables to the Power Bar
6.4.2
Prepare the power connection according to the cabling plans, see 15.1 Cable Plans.
Step 1)
Each column of cabinets is wired to one terminal in the Power bar.
Connect the conductors of the external power cables (L, N, PE) to the terminals in the
Step 2)
Power bar. See also Figure 57.
Connect each conductor (L, N, PE) to its appropriate terminal (L, N, PE). The coloring
and the positions may differ from Figure 57.
Caution!
Risk of electric shock and product damage.
Ensure the Power bar and the whole LED Wall are properly grounded before
putting it into use.
Check the Power Supply and Data Connection of the Modules
6.4.3
With the NovaLCT software, you can check whether the power supplies of each module work
properly and whether the data transmission between the cabinets works properly. Install the
Software, see 7.2 Install Controller Software NovaLCT, and load the screen files, see 7.3
Configure the Screen in NovaLCT. After that, follow 8.3 Monitoring, section 8.3.2 to 8.3.4.
If you find an error, check the wiring and the connection of the Network and supply sockets.
Содержание LED-FA025i2-220
Страница 61: ...61 Figure 78 Screen Settings for 8 8 Controller...
Страница 91: ...91 Part Name AC terminal Hub For 0 9 mm only CAT cable Mask For 1 5 1 9 2 5 3 8 mm only...
Страница 96: ...96 LED FA015i2 137 Data Connections 15 1 3 LED FA015i2 137 Power Connections 15 1 4...
Страница 97: ...97 LED FA019i2 165 Data Connections 15 1 5 LED FA019i2 165 Power Connections 15 1 6...
Страница 99: ...99 LED FA012i2 220 Data Connections 15 1 9 LED FA012i2 220 Power Connections 15 1 10...