Setting Up Your Server 3-11
2.
At least two persons are required to install the server. Securely hold the server and install
it in the rack.
Firmly fit the inner rails on the sides of the server into the rail assemblies that are installed
on the rack, and then slowly push the server into the rack.
3.
If the server is locked on its way into the rack, slowly push it in while pressing the release
levers (blue) on the right and left sides of the server.
When the server is completely pushed into the rack, the server is locked.
Rail assembly
Inner rail at server side
Release lever (blue)
Содержание Express5800/120Rh-1
Страница 16: ...x This page is intentionally left blank ...
Страница 148: ...4 58 Configuring Your Server The detailed settings is continued to the next page Click Next to view more information ...
Страница 159: ...Configuring Your Server 4 69 Use this menu to define several physical drives PD as a disk group DG ...
Страница 183: ...Configuring Your Server 4 93 3 Setting menu for VD 0 is displayed ...