
Setting Up Your Server 3-11
The POWER/SLEEP lamp on the front of the server comes on.
In a few seconds, the NEC logo appears on the screen and the Power On Self-Test (POST)
begins.
The POST runs automatically when you power on the server or reset it with a keyboard
operation (
Ctrl
+
Alt
+
Delete
). The POST runs diagnostics, initializes the server, sets
interrupt vectors, detects installed peripheral devices, and boots the operating system (if
installed). See Chapter 2 for detailed description on POST.
If the server halts before completing the POST, the POST emits a beep code indicating a
fatal system error requiring immediate attention. (See Chapter 8, "Troubleshooting," for
troubleshooting information.)
During memory test, the POST displays the amount of memory it was able to access and
test. Depending on the amount of installed memory, it may take several minutes to
complete the memory test.
NOTE:
The factory-set is defined to hide the POST screen with the
NEC logo screen. You can always change the NEC logo screen to the
POST screen by pressing
Tab
. To change the start-up screen, use the
BIOS SETUP utility. (See Chapter 4 for details.)
During the POST, you will see the banner message to prompt you to launch the BIOS SETUP utility
stored in ROM on the mother board or on an installed option board.
Start the BIOS SETUP utility appropriate to your system environment to change the CMOS Setup.
For detail explanation on the BIOS SETUP utility for the server, see Chapter 4. For the BIOS utility
for the option board, refer to the manual that comes with the option board.
IMPORTANT:
Always allow POST to complete before turning off
your system.
Содержание Express5800/110Ge
Страница 31: ...General Description 2 5 Rear View 1 2 3 2 4 5 6 7 8 9 10 12 11 13 ...
Страница 48: ...2 22 General Description This page is intentionally left blank ...
Страница 157: ...Installing and Using Utilities 6 9 4 Click Parameter File Creator Parameter File Creator will appear ...
Страница 216: ...9 6 Upgrading Your Server 3 Loosen the two screws 4 Hold the side cover securely to remove it ...
Страница 217: ...Upgrading Your Server 9 7 5 Position the server until on its right side ...
Страница 256: ...9 46 Upgrading Your Server This page is intentionally left blank ...
Страница 266: ...10 10 Internal Cabling Diagrams This page is intentionally left blank ...
Страница 268: ...A 2 Specifications This page is intentionally left blank ...
Страница 276: ...C 2 IRQ This page is intentionally left blank ...
Страница 328: ...F 2 Using a Client Computer Which Has a CD Drive This page is intentionally left blank ...
Страница 332: ...G 4 Product Configuration Record Table This page is intentionally left blank ...