Installing Server
3-15
Steps to Install the Rack-mount Model to the Tower Conversion Kit
Follow the procedure below to install the devices to the tower conversion kit.
1.
Open the front door of the tower conversion kit.
If the door is locked, use the server-accessory key
to unlock.
2.
Confirm the spots to fix 8 core nuts on the front
of the chassis.
See the figure on the right for where to fix
the core nuts
(4 on the front top and 4 on the front bottom.)
8 core nuts have been installed on the front of the
chassis.
3.
Insert the bracket from the front of the conversion
kit. Tuck the bracket firmly to the back.
Tower conversion kit (on the front bottom)
Tower conversion kit (on the front top)
Содержание EXP320K
Страница 11: ......
Страница 18: ...1 2 Before Using 在使用前 為了把本裝置做為安全確實變成使用必要的關於信息 實體及附屬品等記載著 在安裝實體之前 必定 請讀 同時 關於本文中的名稱請參照用戶指南的 與各部分的名稱功能 的項 ...
Страница 38: ...1 22 Before Using This page is intentionally left blank ...
Страница 70: ...4 10 ESX Server Setup 9 Move the cursor onto Embedded SAS Option ROM and press Enter Parameters appear ...
Страница 77: ...ESX Server Setup 4 17 1 4 Select Enable or Disable BIOS 1 5 Select 1 so that Enabled is configured ...
Страница 79: ...ESX Server Setup 4 19 1 8 Select the location for Boot Entry select 1 1 9 Select the boot device select 01 ...
Страница 80: ...4 20 ESX Server Setup 1 10 Enter LUN Hex select 00 1 11 Select Boot LUN select 01 ...
Страница 108: ...5 16 Procedures after Completion of Installation This page is intentionally left blank ...
Страница 112: ...6 4 Troubleshooting This page is intentionally left blank ...
Страница 114: ......
Страница 115: ......