47
Document Number
DCV-00402
Date Released
Jun. 2019
Revision Number/Security level
R02 S2
Retrofit G6+InvencoLink Wayne Vista 3V (US) Installation Guide
Fig. 6.10
–
Attach grounding cable.
11. Temporarily detach the grounding nut from the Retrofit Kit. Retain the nut.
Fig. 6.11
–
Temporarily detach grounding nut.
12. Loosen the retainer bracket screws on the back of the OPT using a 3mm Hex Key. Two screws.
This will allow insertion of the cables into the connectors.
CAUTION: