54
Document Number
DCV-00402
Date Released
Jun. 2019
Revision Number/Security level
R02 S2
Retrofit G6+InvencoLink Wayne Vista 3V (US) Installation Guide
21. With the OPT hanging freely, cable tie the bundle of cables to the side of the Insulating Shield
Cover as shown, through the holes provided. Before finally tightening the cable tie, check that
there is enough length of cable to allow the RFK door to be fully opened without placing undue
strain on the cables or the connectors.
Fig 6.21
–
Cable tie cable bundle to Insulating Cover.
22. Route the cable bundle around the corner of the Insulating Cover Shield using cable ties as
shown through the holes provided. Ensure the bend radius and cable ties keep the cable bundle
clear of the sheet metal edges on the corner of the Cover.
Fig. 6.22a
–
Keep cables clear of corner. Fig 6.22b
–
Use cable tie holes provided.