![Nautel NX50 Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/nautel/nx50/nx50_installation-manual_3582150025.webp)
NX50 Installation Manual
Installing the power transformer
Issue 6.1 2021-07-13
Page 3-1
Section 3:
Installing the power
transformer
1. Before placing the transformer into the transmitter, set the line voltage tap selections.
Based on your nominal line to line voltage, select the appropriate tap position
identified on the labels mounted on the terminal board end of the transformer. One
label identifies the tap number and the line-to-line voltage. Another label identifies the
tap. All phases must be set to the same tap (see also
and
). If necessary, use the hardware already on each of the three
copper straps to connect the straps to the new tap positions. Be sure to scrape any
excess epoxy off the electrical joint area.
Figure 3.1: NX50 power transformer line voltage tap layout (350 - 510 V or 570 - 630 V)
5
4
3
2
1
Load 3
Line 3
Load 2
Line 2
Load 1
Line 1
6
Load 0
Содержание NX50
Страница 1: ...NX50 Transmitter Installation Manual Document NHB NX50 INS Issue 6 1 2021 07 13 Status Standard...
Страница 2: ......
Страница 4: ......
Страница 8: ...NX50 Installation Manual Page viii Issue 6 1 2021 07 13...
Страница 12: ...NX50 Installation Manual Preparing for installation Page 1 4 Issue 6 1 2021 07 13...
Страница 24: ...NX50 Installation Manual Unpacking and positioning Page 2 12 Issue 6 1 2021 07 13...
Страница 36: ...NX50 Installation Manual Connecting ac power Page 5 2 Issue 6 1 2021 07 13...
Страница 40: ...NX50 Installation Manual Adjusting the spark gap Page 6 4 Issue 6 1 2021 07 13...
Страница 62: ...NX50 Installation Manual Parts and tools Page 10 4 Issue 6 1 2021 07 13...
Страница 73: ......