https://www.naturewater.eu
Item 63920, 63921
Page 9
11 2023-1
Installation
The water treatment device must be installed, tested, and put into operation for the first time by a spe-
cialist. The following installation steps are only intended as a guide (using a PPR pipe as an example).
1.
Install the water-inlet and -outlet pipes on the wall according to the actual height of the product
above the floor (sold separately).
№
Name
№
Name
1
Clamp (fixed water pipe)
4
Intake
2
Outlet
5
Inlet pipe
3
Outlet pipe
6
Clamp (fixed water pipe)
Note!
Please note the actual height and installation environment of the selected product.
2.
Connect the bypass pipe connection to the water inlet and outlet.
№
Name
№
Name
1
Connection point
3
Outlet pipe
2
Outlet
4
Clamp (fixed water pipe)
5
2 points
6
O-ring
Note!
Make sure that the O-ring has been fitted.
3.
Open the top cover, pull out a section of the connection to the display panel as shown, if nec-
essary, cut off a drain pipe, and lay it accordingly (secure the hose with a clamp), arrange the
drain pipe, and connect it to the drain.
mm